Job Title: |
|
Electrical / Instrumentations Technician |
Category: |
|
Engineering |
Total Positions: |
|
1 |
Job Location: |
|
Karachi |
Gender: |
|
Male |
Minimum Education: |
|
Diploma |
Career Level: |
|
Experienced Professional |
Minimum Experience: |
|
4 Years |
Salary Range: |
|
PKR 0 to 0 per Month |
Apply By: |
|
Nov 16, 2019 |
|
|
|
|
|
|
|
|
Job Description: |
We require experienced technicians for routine electrical system maitinance and instruments Clibration capablity.
Diploma holder with demonstrated capablity to work independently under minimum supervision are requested to send across resume with complete experience details. |
Required Skills: |
Diploma in Instrumentation, calibration of transmitters, liquid level gauges, Dcs knowledge. calibration equipment knowledge. |
Company Information |
|
Company Name: Fine Gas Karachi Company Description: Fine Gas Karachi (E-32/33 NWI Zone Port Bin Qasim, 021-4750337-39 @ fglimited@gmail.com) was established to meet the fast growing demands of Industrial zones and large number of new Hospitals by shifting the existing 25 TPD Air Separation Plant from Lahore and was installed at Port Qasim Karachi in 2002. Fine Gas Company commenced in 2002 and has earned a place in a very competitive market within a short span of 4 years. Later in 2004, Dissolved Acetylene Plant was commissioned at Karachi to fulfill the ever increasing demand of Karachi w.r.t Dissolved Acetylene. Following is a brief over view of plants at Karachi.
Future Perspective is to meet the increasing demand of ever increasing Hospitals; a new plant for Nitrous Oxide Gas with a huge production capacity of 70 Kg/hr is being fabricated by our experienced Maintenance Department and will soon become operational by Dec-06. The existing Nitrous oxide Plant with 30 Kg/Hr production capacity will be shifted to Karachi to meet the hospital requirements as currently Nitrous Oxide Gas is being supplied from Lahore. Also new Dissolved Acetylene Plant is being procured for Fine Gas Lahore with enhanced capacity of 45 M3/Hr to upgrade the existing plant.
|
|